Action Review for Outcome (h) Know engineering's global societal
context |
2004 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
Greater
coordination of ABET criteria (h) and (i) within MET 321 and MET 310. |
Curriculum
Review Summary |
|
|
|
|
Scores
stayed essentially constant from 2003 to 2004, but the number and type of
review was increased and incuded more than senior design. The students
performed well. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
W |
Watch
coordination |
Coordinate
Outcomes (h) and (i) within MET 321 and MET 310. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
No
Assessment Process Action was suggested. |
Assessment
Process Review Summary |
|
|
|
|
Assessment
Process seems to be working well. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
N |
|
|
|
|
|
|
|
|
2005 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
No
Curriculum Action Review actions were suggested for outcome (h). |
A Curriculum Action Review watch item was given in 2004. |
Curriculum
Review Summary |
|
|
|
|
The
global and societal outcome showed a
large decrease in student performance for 2005 as compared to
2004. This was accompanied by a large
decrease in the total number of assessments.
The decrease in the number of assessments was likely due to a shift in
which portions of the curriculum were used to evaluate Outcome (h). |
The watch item from 2004 will be continued to 2005 as the curriculum shift of
Outcome (h) was implemented in part due to this watch, and the courses in
which implementation occurs are offered every other year. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
W |
Curriculum
Shift |
As
the curricular areas assessing global and societal context are being shifted,
watching to ensure this goes smoothly is important. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
No
Assessment Process Action was suggested for Outcome (h) from 2004. |
A general assessment action item concerning better metric matching in all
ABET Outcomes was delineated. This
action requested questions for an exit exam for the graduating seniors. |
Assessment
Process Review Summary |
|
|
|
|
During
2005, the global and societal context requirements were a little sparse, most
likely due to lag in changing class procedures to accommodate this
requirement. This situation should be
monitored to ensure that the requirements are fulfilled. |
Question collection was begun, but the exit exam is not expected to be fully
operational until 2007. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
W |
Curriculum
Shift |
As
the curricular areas assessing global and societal context are being shifted,
watching to ensure this goes smoothly is important. |
A |
Question
Collection |
Questions
for a new exit examination will be sought. |
|
|
|
|
|
|
2006 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
No
Curriculum Action Review actions were suggested for outcome (h). |
A Curriculum Action Review watch item was given in 2004 and continued to
2005. |
Curriculum
Review Summary |
|
|
|
|
Student
performance was similar to that in 2005, but is somewhat lower than
desired. The number of assessments was
good this year, indicating that the curriculum shift is working |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
W |
Student
Performance |
Student
perfromance has not been at the desired level for consecutive years, if this
continues action will be required. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
From
2005, a watch and an action were seen as needed for Assessment Process Action
concerning Outcome (h). |
The
watch related to the shoft in Outcome (h) assessments between courses. |
The action related to collecting questions for an exit examination. |
Assessment
Process Review Summary |
|
|
|
|
The
instruments used for assessment provided a large increase in the number of
assessments, indicating that the watch can be lifted. |
The question collecting action is in progress as the exit examination was
not ready for implementation in 2006. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
A |
Question
Collection |
|
|
|
|
|
|
|
2007 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
No
Curriculum Action Review actions were suggested for outcome (h). |
A Curriculum Action Review watch item was given in 2006 regarding student
performance. |
Curriculum
Review Summary |
|
|
|
|
During
2007, the global and societal context students assessed were not quite up to
the level desired. This was true in
the previous year also, indicating this area may need some curricular work. |
A watch item is felt to be necessary as new faculty have recently been hired
and as these faculty begin to understand the what is required in Outcome (h)
the student's understanding of global and societal context should improve. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
W |
Student
Performance |
Student
performance has not been subpar, but has been less than desired for three
years. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
No
Assessment Process Action Items were given for 2007. An Assessment Process Action watch was
given related to student performance. |
Assessment
Process Review Summary |
|
|
|
|
The student performance watch item will be carried over, as this issue has
yet to be resolved fully. |
The
local exam was given for the first time.
The results will need to be watched to ensure that the exam adequately
assesses ABET Outcome (h). |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
W |
Local Exam |
Correspondence
of Local Exam results with other Assessment instruments. |
|
|
|
|
|
|
2008 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
No
Curriculum Action Review actions were suggested for outcome (h). |
A Curriculum Action Review watch item was given in 2007 regarding student
performance. |
Curriculum
Review Summary |
|
|
|
|
Student
performance was much improved in 2008.
The number of assessments remained high. |
Despite the improvements in performance, the watch \item will be continued to
2009 to ensure that 2008 was not a fluke. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
W |
Student
Performance |
Student
performance has recently improved but a watch is needed to ensure that this
improvement is due to the curriculum and not a fluke performance. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
No
Curriculum Action Review actions were suggested for outcome (h). |
A Curriculum Action Review watch item was given in 2007 regarding student
performance. |
Assessment
Process Review Summary |
|
|
|
|
In
general the Assessment Process appeasr to be working well. |
The watch action is still felt to be warranted, as one year of data is
insufficient to determine whether or not the new faculty initiatives are
working. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
W |
Student
Performance |
Student
performance has recently improved but a watch is needed to ensure that this
improvement is due to the curriculum and not a fluke performance. |
|
|
|
|
|
|
2009 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
A
Previous Curriculum Action Item watch was given in 2008, as performance had
only recently begun increasing. |
Curriculum
Review Summary |
|
|
|
|
As
the scores have been increasing the curriculum seems to be better addressing
Outcome (h). |
N |
No action
required. |
|
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
A
Previous Assessment Process Watch Action was given in 2008 for 2009. |
Assessment
Process Review Summary |
|
|
|
|
Student
performance improved indicating that the watch does not need continuation. |
Little variation was observed in the mean assessments in both
2008 and 2009, so a watch may be needed to determine if this is a short term
fluke or if the instruments used are a little too blunt. |
W |
Mean
Variation |
Watch
if the variation of the means stays too small |
|
|
|
|
|
|
2010 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
|
As
the scores have been increasing the curriculum seems to be better addressing
Outcome (h). |
Curriculum
Review Summary |
|
|
|
|
The
student performance remains unchanged at approximately 4. The previous action to cure low student
performance has remained successful, so the action is dismissed. No
additional action is required. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
|
N |
No Action |
No
action is required |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
Student
performance improved indicating that the watch does not need continuation. |
Little variation was observed in the mean assessments in both 2008 and 2009,
so a watch may be needed to determine if this is a short term fluke or if the
instruments used are a little too blunt. |
Assessment
Process Review Summary |
|
|
|
|
The
previously watched variation in instruments and metrics has remained minimal
so the watch action is dismissed. No action required. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
N |
No Action |
No
action is required |
|
|
|
|
|
|
2011 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
|
The
student performance remains unchanged at approximately 4. The previous action to cure low student
performance has remained successful, so the action is dismissed. No
additional action is required. |
Curriculum
Review Summary |
|
|
|
|
Student
performance has shown a continual slight decline. Watch to see if 2011 is an
aberation or permanent decline. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
|
W |
Watch for
failure to improve |
Watch
to see if student performance continues to decline. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
The
previously watched variation in instruments and metrics has remained minimal
so the watch action is dismissed. No action required. |
Assessment
Process Review Summary |
|
|
|
|
The
process appears to be working well. No action is needed. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
N |
No Action |
No
action is required. |
|
|
|
|
|
|
2012 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
|
Student
performance has shown a continual slight decline. Watch to see if 2011 is an
aberation or permanent decline. |
Curriculum
Review Summary |
|
|
|
|
All
metrics and instruments show a large decline in student performance. Design reports are much lower perhaps
reflecting higher expectations and a weak class cohort. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
|
A |
Rapid Decline
in G-S Context |
Correct
the decline in Global-Scocietal Context understanding. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
The
process appears to be working well. No action is needed. |
Assessment
Process Review Summary |
|
|
|
|
The
instruments and metrics appear to have identified a significant decrease in
performance so are deemed to be working as designed. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
N |
No Action |
|
|
|
|
|
|
|
2013 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
|
All
metrics and instruments show a large decline in student performance. Design reports are much lower perhaps
reflecting higher expectations and a weak class cohort. |
Curriculum
Review Summary |
|
|
|
|
The Global Societal Instructional Module was relocated in the
curriculum to the combined Junior-Senior Design Sequence, and a dedicated
design lecture was given by Dr. Howard on this topic. The former assures every student will see
the topic twice, and the later that the students will be able to see the
topic put into action during the presentation. The Instructional Module was also updated,
and will be annually, to add content so as to improve student interest and
engagement. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
|
W |
Watch (h)
Performance |
Watch
(h) performance to see if students continue to improve. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
The
instruments and metrics appear to have identified a significant decrease in
performance so are deemed to be working as designed. |
Assessment
Process Review Summary |
|
|
|
|
The
instruments seem to be reporting well.
No Change needed. |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
N |
No Change |
|
|
|
|
|
|
|
2014 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
|
The Global Societal Instructional Module was relocated in the
curriculum to the combined Junior-Senior Design Sequence, and a dedicated
design lecture was given by Dr. Howard on this topic. The former assures every student will see
the topic twice, and the later that the students will be able to see the
topic put into action during the presentation. The Instructional Module was also updated,
and will be annually, to add content so as to improve student interest and
engagement. |
Curriculum
Review Summary |
|
|
|
|
The
perfomance was down from 3.51 to 3.09.
Additional requirements on the topic need to be added to the Design
Reports. This can occur by requiring a
specific section of the Deisign Reports to cover this topic. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
|
A |
Design Report
Global Context |
Add
more Global-Societal Context requirements into Design Reports. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
The
instruments seem to be reporting well.
No Change needed. |
Assessment
Process Review Summary |
|
|
|
|
No
change needed |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
|
|
|
|
|
|
2015 |
|
|
|
|
|
Previous
Curriculum Action Review Summary |
|
|
|
|
The
perfomance was down from 3.51 to 3.09.
Additional requirements on the topic need to be added to the Design
Reports. This can occur by requiring a
specific section of the Deisign Reports to cover this topic. |
Curriculum
Review Summary |
|
|
|
|
Student
performance increased from 3.09 to 3.37.
After some discussion the faculty decided to add more content to MET
321 and MET 310 to further bolster this topic. |
Code |
Curriculum Action Title |
Curriculum Action Brief
Description |
|
|
A |
Increased
Global/Societal content |
Add
content on Outcome (h) to MET 321 and
Met 310. |
|
|
|
|
|
|
Previous
Assessment Process Action Review Summary |
|
|
|
No
change needed |
Assessment
Process Review Summary |
|
|
|
|
No
Change needed in assessment system |
Code |
Assessment Process Action Title |
Assessment Process Action
Brief Description |
|
N |
No Change |
|
|
|
|
|
|
|